Arrival of new lab in a container C8S’s new testing facility

Following strict protocols associated with the COVID- 19 restrictions, the new laboratory in a container was delivered to the University of Greenwich’s Medway Campus. The fully fitted laboratory will be used to develop mix designs to treat a variety of industrial residues and hazardous wastes using Accelerated Carbonation.


The facility will enable the C8S technical team to manufacture larger quantities of materials in carefully controlled conditions for testing against current material standards.