C8S exhibit at RWM

C8S in collaboration with Wright Engineering and Rapid Innovation Group (RIG) has successfully completed a 12-month project to develop the design of the CO₂ntainer system. RIG undertook a detailed investigation into the international market for the system and a review of the potential business models for its deployment.


Meanwhile, thanks to the generosity of Hanson Cement, the demonstration CO₂ntainer system was deployed to the Ketton Cement Plant where the instrumentation and monitoring equipment for CO₂ capture and utilisation could be tested using CO₂ from a real flue using cement by-pass dust. Two products were manufactured for end user tweeting

22. News story image 3